Platform qualification

IEC 63413 compliance · Classes 1 / 2 / 3 · Supplier audit

Talk to an expert

Qualifying a PLC for a nuclear safety-classified system means demonstrating its compliance with IEC 63413 - not just on paper. ISO Ingénierie structures the approach into Groups of Investigations, carries out the audit at the supplier's premises to access confidential documents, defines compensatory measures whenever a deviation arises, and formalises everything in a Qualification Report that can be upheld before ASN.

Integrating a PLC into a nuclear safety-classified system is not simply a matter of picking a product off a catalogue. The IEC 63413 standard requires that the selected equipment be shown, requirement by requirement, to meet the safety expectations of its class (1, 2 or 3). This demonstration relies on structured analysis, on access to the supplier's design information, and - when compliance is not immediate - on the definition of compensatory measures acceptable to the regulatory authority.

For more than 20 years, ISO Ingénierie has been running these processes for architect-integrators, BNI operators and suppliers of control & command systems. Our expertise covers both general-purpose PLCs (SIEMENS S7-1500) and safety PLCs (HIMA HIMAX), on projects for EDF, CEA, ITER and DCNS.

Your needs

What you expect from a partner specialised in the qualification of nuclear platforms.

01

Guarantee full compliance of the selected PLC with the requirements of IEC 63413, the essential reference standard for control & command systems in a nuclear environment.

02

Rely on a rigorous analysis methodology, capable of covering every technical and quality dimension of the PLC, leaving no grey areas.

03

Assess the robustness of the quality process deployed by the supplier during design, in order to objectively characterise the industrial maturity of the product.

04

Go beyond public documentation by accessing, where necessary, the supplier's confidential information, so as to objectively establish actual compliance.

05

Have concrete solutions on hand when deviations are detected, in the form of compensatory measures that maintain the required level of safety.

06

Formalise the results of the analysis in a reference document, usable by your safety teams and your regulatory authorities.

Our method

A 6-step approach, proven on EDF projects, to cover the full set of IEC 63413 requirements.

  1. 01

    Structuring by Groups of Investigations (GI)

    Grouping of requirements under broad themes: inputs/outputs, communication, performance, reliability, tools, and any other theme relevant to the specifics of the PLC.

  2. 02

    Analysis of the supplier quality process

    Assessment of the rigour and traceability of the practices implemented during the design phase, upstream of commissioning.

  3. 03

    Detailed technical analysis per Group of Investigation

    Requirement by requirement, a precise status of the PLC's level of compliance against the expectations of IEC 63413.

  4. 04

    On-site supplier audit

    In-depth review of the confidential documents required for the analysis, on the supplier's own premises.

  5. 05

    Implementation of compensatory measures

    As soon as a deviation is identified, definition of measures that guarantee an equivalent level of safety despite the observed non-conformity.

  6. 06

    Drafting of the Qualification Report

    Formalisation of all the findings, analyses and conclusions arising from the approach, a reference deliverable for your safety teams and for ASN.

Our strengths

  • A structured approach based on Groups of Investigations, guaranteeing comprehensive coverage and a clear reading of the normative requirements.
  • Proven experience in conducting supplier audits, including on documents of a confidential nature.
  • A solution-oriented approach, thanks to the definition of compensatory measures tailored to each deviation encountered.
  • A structuring deliverable: the Qualification Report serves as a solid documentary foundation for safety decisions.

Our offer

We support you in the qualification of your PLCs against the IEC 63413 standard, from the initial structuring of requirements by Groups of Investigations, through to the drafting of the Qualification Report, by way of detailed technical analysis, the supplier audit and, where necessary, the implementation of compensatory measures.

Our references

Supplier
SIEMENS
PLC S7-1500
Class Class 3 under IEC 61513
Project EDF K3/C3
Duration 2 years
Supplier
HIMA
PLC HIMAX (safety PLC)
Class Class 2 under IEC 61513
Project EDF DEL Bis
Duration 2 years
Train on the approach

Training course "The IEC 63413 standard and the qualification approach"

A 2.5-day training course delivered to the main players of the French nuclear sector, to master the requirements applicable to safety I&C systems.

View the nuclear training courses
- To go further

Related resources and topics

Ready to grow your team's expertise?

Contact our team for a tailored quotation or to register for our 2026 training sessions.